The failure is usually vibration, not impact
When a crated machine arrives damaged, the instinct is to assume somebody dropped it. Occasionally true. Far more often the damage accumulated across long road miles and weeks at sea, as a part that was not fully restrained moved a few millimetres, again and again.
Vibration finds every void. A machine blocked tightly in five directions and loose in the sixth will migrate in that one direction until it contacts something it should not. Fasteners back out, shafts fret, mounting feet shear. None of it looks like impact damage because it is not.
So the first principle of machinery crating is restraint in all six directions, with no reliance on friction and no voids filled by foam alone — foam compresses, takes a set, and then stops working.
How a crate gets designed
Establish weight and centre of gravity
Not the catalogue weight — the actual shipping weight with fluids drained and loose parts separated. The centre of gravity determines skid placement, sling points and whether the crate will tip when a forklift picks it up at the far end.
Identify the load-bearing structure of the machine
Crating transfers handling forces around the product, into the frame members that can take them — never through a sheet-metal cover or a control panel. If the machine has designated lifting or mounting points, those are where the bracing connects.
Design the skid base for the receiving forklift
The forklift at the destination may be smaller, have shorter tines or a lower free-lift than yours. Skid height, spacing and the number of runners all follow from the worst-case handling equipment in the lane, not the best case.
Block in six directions
Cleats, blocks and cradles contacting the machine frame, fastened to the crate structure. Bolt-through to the skid base for heavy items. The machine should not move at all when the crate is rocked by hand.
Add moisture control
VCI film or paper on machined surfaces, desiccant sized to voyage length and cargo mass, a vapour barrier where appropriate, and a humidity indicator card so any claim can be diagnosed rather than argued.
Sheath, treat and mark
Plywood or solid board sheathing, corner cleats and a top frame for stacking. The whole assembly — frame, skids, internal bracing — is heat treated and IPPC marked on two opposite sides.
Stencil what the far end needs to know
Centre of gravity, sling points, this-way-up, do-not-stack, gross weight, dimensions. Riggers at the destination do not have your drawings and will not call to ask.
The details that decide outcomes
| Detail | Why it matters | Common failure |
|---|---|---|
| Skid count and spacing | Distributes concentrated weight; prevents base flexing | Two skids under a heavy centre load; the base bows and the machine racks |
| Internal bracing fastened to structure | Transfers handling loads around the product | Blocks resting against the machine with nothing holding them |
| Foam used as a primary restraint | Takes a set and stops restraining | Void appears in week two of the voyage |
| Corner cleats and top frame | Crates fail at corners first under stacking | Sheathing-only corners that crush |
| Desiccant sizing | Absorbs the water that leaves wood and cardboard | Two bags in a 40′ container, as decoration |
| Centre-of-gravity marking | Prevents tipping during handling at destination | Unmarked crate tipped off a forklift |
| ISPM-15 on bracing and skids | Plywood is exempt; the frame is not | Compliant sheathing on a non-compliant frame |
Questions we get asked
Does a plywood crate need ISPM-15 treatment?
The plywood sheathing is exempt, but the cleats, corner posts, skids and internal bracing are solid wood and fully in scope. In practice this means essentially every cleated plywood crate still requires treatment and marking, because its structure is solid lumber. It is a common export compliance mistake.
How much desiccant does a crate need?
It scales with voyage length, enclosed volume and the moisture available in the cargo and packaging. Any single number quoted for all crates is a guess. Size it per shipment and include a humidity indicator card so the assumption can be checked after arrival.
Can a crate be built to a customer drawing or specification?
Often, where the requirements are documented. Mention the drawing or specification in the Message field of the quote form, and the partner supplier can tell you plainly whether it can be met before anyone commits.