Industry
Pallets for Manufacturing
Manufacturers need three distinct things from a wood packaging supplier: predictable production platforms, flexible containers for work-in-progress and bulk parts, and export packing that arrives intact and compliant. Describe what you need on the quote form and we pass it to a partner supplier; on-site crating for machinery that cannot be moved depends on the supplier.
Request a quote
Quantity, grade and ZIP are enough for a partner supplier to follow up with a quote.

Three different problems, often one supplier
The production platform problem is about consistency. If pallets feed a line, an automated cell or a conveyor, the binding constraint is usually tolerance rather than strength — squareness, board thickness consistency and bottom-surface continuity. A population with mixed thicknesses and ±½" squareness generates faults no matter how strong each unit is.
The work-in-progress problem is about flexibility. Bulk parts moving between cells need containers whose depth can change and that collapse when empty. Pallet collars solve this better than anything else and are chronically overlooked in North America.
The export problem is about arriving intact and compliant. Most machinery damage is vibration over distance rather than a dramatic drop, and most compliance failures are a stamp on a board that was replaced, or a chock the packer nailed in at the last minute.
What manufacturers typically request
| Need | Product | Notes |
|---|---|---|
| Line-side and production platforms | New block pallets, or Grade A sorted to tolerance | Specify squareness, thickness class and bottom configuration |
| Work-in-progress containers | Pallet collars, commonly 8" and 16" | Stack as deep as needed; fold flat when empty |
| Bulk parts and scrap recovery | Bulk bins, reclaimed and new | Ventilated or solid wall |
| Heavy machine bases | Custom skids, doubled stringers, 1"+ deck, bolt points | Built to the load by the supplier |
| Cylindrical goods | Cradles and saddles | Pipe, coil, drums, tanks, rolls |
| Export machinery | Cleated plywood or solid board crates | Braced in six directions, treated and marked |
| Export pallets | Grade A heat treated, freshly marked | Ask for the ISPM-15 mark |
| Dunnage and bracing | Cut lumber, chocks, wedges, blocking | Heat treated when the shipment is international |
| Scrap and offcut handling | Collection and recycling | Availability depends on the partner supplier |
The mistakes that cost manufacturers most
- Commissioning automation on pristine pallets
- Hand the integrator fifty units pulled at random from what you will really run, not a sample of the best ones. Fault rates that appear in month three were set at commissioning.
- Untreated dunnage in a compliant container
- One chock makes the whole container non-compliant. It is the most forgotten item in export packing and the cheapest to get right.
- Stamps on replaced boards
- A repair with untreated lumber invalidates the original mark. The remaining stamp is a false statement about wood that is no longer there.
- Foam as a primary restraint
- It compresses, takes a set and stops restraining. The void appears in week two of the voyage and the part migrates for the rest of it.
- Skids sized for your forklift, not the receiver's
- The forklift at the destination may have shorter tines and lower free-lift. Design for the worst-case equipment in the lane.
- One pallet grade for everything
- Line-side tolerance requirements and internal scrap handling do not need the same specification. Split them.
Wood packaging across a manufacturing site
A walk-through of where wood appears in a typical plant and what each application actually needs. Many sites use one specification everywhere and over-specify in some places.
| Location | Application | Right specification | Common mistake |
|---|---|---|---|
| Receiving dock | Inbound component pallets | Whatever arrives — sort and sell the cores | Paying a hauler to remove sellable stock |
| Raw material store | Racked storage | Grade A, support condition stated | Unsupported racking on notched stringer |
| Line side | Production platforms | New block to tolerance, or sorted Grade A | Commissioning automation on pristine samples |
| Between cells | WIP transfer, bulk parts | Collars on Grade B bases | Buying rigid bins and storing the empties |
| Sub-assembly | Kitting | Collars one deep, or half pallets | Full pallets for small kits |
| Finished goods | Outbound to customers | Grade A — receiving teams inspect | Grade B, then a damage conversation |
| Export packing | Crates and treated pallets | HT and marked, braced six directions | Untreated chocks nailed in at the last minute |
| Machine despatch | Equipment bases | Engineered skid with bolt points | Doubled-up standard pallets and plywood |
| Scrap and offcut | Recovery | Collars or bins; collected | A skip |
| Tooling store | Heavy point loads | Heavy deck, doubled stringers | Standard GMA cracking across the boards |
Export packing checklist
A general checklist for packers. Most export failures trace back to one of these lines. Check current regulations for the destination.
- 1. Every solid wood item treated
- Pallets, crate frames, skids, cleats, blocking, chocks, cradles and lashing timber. Plywood sheathing is exempt; its frame is not.
- 2. Marks legible on two opposite sides
- An inspector who cannot read a mark treats the item as untreated.
- 3. No repairs with untreated lumber
- A replaced board can invalidate the mark on the whole unit.
- 4. No MB-stamped wood anywhere in the load
- Refused by some importing countries.
- 5. No last-minute untreated chocks
- The single most forgotten item in export packing. Keep treated dunnage at the packing station.
- 6. Bark checked
- ISPM-15 limits residual bark and some destinations enforce it closely.
- 7. Treated and untreated stored separately
- Re-infestation is a real mechanism, so segregation is good practice.
- 8. Desiccant sized to the voyage
- Scales with enclosed volume, cargo moisture and crossing length. Two bags in a 40′ is decoration.
- 9. VCI on machined surfaces
- Container condensation will find bare metal.
- 10. CoG and sling points stencilled
- Riggers at the far end do not have your drawings.
- 11. Treatment records with the paperwork
- Ask the treating supplier for its record.
- 12. Humidity indicator card inside
- Makes any claim diagnosable rather than arguable.
Collars for work-in-progress: how the case works
The application manufacturers most consistently overlook, and the reasoning behind it.
- The problem
- Bulk parts moving between cells in rigid bins. At any moment a share of the bins are empty, occupying rack positions or floor space for nothing.
- The collar alternative
- Collars on standard Grade B base pallets. Empty collar sets fold flat, and the base pallets go back into general use rather than sitting under empty bins.
- Depth flexibility you did not have
- One collar deep for a shallow kit, more for a bulk load. Rigid bins are one depth forever, so sites often end up buying several bin sizes to cover the range.
- Repairability
- A broken panel is replaced. A cracked plastic bin is finished. Over a long service life this can matter more than the purchase price.
- What it costs you
- Assembly and disassembly labour, and somebody looking at hinges occasionally. For variable-volume applications that trade is usually worth it; for a fixed-depth high-throughput loop, a rigid bin is simpler.
- How to test it
- Take a few collars and put them in the one process that annoys you most. It either clicks immediately or it does not.
Questions we get asked
Can you match a pallet we already use?
A partner supplier usually can. Describe it in the quote request, and mention in the Message field that you have a sample; the supplier can ask for photos or the pallet itself, work out board count, spacing, lumber class and fastener pattern, and quote a build that interchanges with your existing stock.
Are load ratings provided in writing?
Ask the partner supplier for static, dynamic and racking figures on a custom specification, with the support condition named. Do not rely on a racking figure without a support condition, because such a number cannot be used safely.
Can you work to our packaging specification?
Describe the specification in the quote request and we pass it to a partner supplier, who can say plainly whether it can meet it before anyone commits.
Can a spec be kept on file for repeat builds?
Ask the partner supplier. A named specification or build code keeps later orders identical to the first rather than re-described each time, and it is a reasonable thing to ask for on any repeat custom build.
Can I get treated dunnage for our packing station?
Through partner suppliers, often yes, and it fixes a very common export compliance failure. Cut lumber, chocks, wedges and blocking from suppliers enrolled in an approved program, with the mark on it, kept at the packing area so that packers reach for compliant material by default.
We export occasionally. Treat per shipment or keep a pool?
It depends on your volume and storage. Occasional exporters usually treat per shipment and avoid holding inventory. Frequent exporters often find a treated pool less stressful, because the constraint becomes storage rather than scheduling. Compare the two with your own volumes, and ask the partner supplier what it can do.
Can our production scrap wood be collected?
Clean untreated wood packaging and offcuts usually can, where a partner supplier is available. Pressure-treated lumber, painted or coated wood of unknown chemistry and general construction debris usually cannot, because those compromise reclaim and mulch streams.
Keep reading
Last reviewed: 2026-10-31.
Next step
Request a quote for your sector
Tell us what you handle and how it moves, and a partner supplier follows up with a recommendation and a quote.