MenuRePalletSale
A referral serviceContact Us

Service

Custom Crating & Export Packing

A good crate is designed around the part, not a catalogue size: weight, centre of gravity, fragile faces, lift points and the forklift waiting at the destination. Use the quote form and we pass your request to a partner supplier, who sets the design, price and terms. Heat-treated packing comes from suppliers enrolled in an approved program; ask for the mark.

6Directions of restraint
56 °C / 30 minISPM 15 heat-treatment minimum
IPPCThe mark to look for
FreeNo-obligation quote request

Request a quote

Quantity, grade and ZIP are enough for a partner supplier to follow up with a quote.

Specimen tag — request13 fields · 8 required

A partner supplier replies here

US or Canada

US state or Canadian province

US ZIP or Canadian postal code

Whole units

Free, no-obligation quote request. * required · shared with partner suppliers to prepare your quote, never sold.

Most damage is vibration, not impact

When a crated machine arrives damaged, the instinct is to assume somebody dropped it. Occasionally true. Very often the damage accumulated across long road miles and days at sea, as a part that was not fully restrained moved a few millimetres, repeatedly, a great many times.

Vibration finds every void. A machine blocked tightly in five directions and loose in the sixth will migrate in that one direction until it contacts something it should not. Fasteners back out, shafts fret, mounting feet shear, and none of it looks like impact damage, because it is not.

So the first principle is restraint in all six directions, fastened to the crate structure, with no reliance on friction and no voids filled by foam alone. Foam compresses, takes a set, and then stops working.

How a crate should be designed

  1. Weight and centre of gravity

    Actual shipping weight with fluids drained and loose parts separated, not the catalogue figure. The centre of gravity sets skid placement, sling points and whether the crate tips when picked up at the far end.

  2. Find the load-bearing structure

    Handling forces go around the product into frame members that can take them, never through sheet metal or a control panel. Designated lifting and mounting points are where bracing connects.

  3. Size the skid base for the receiving forklift

    The forklift at the destination may be smaller, with shorter tines and lower free-lift than yours. Skid height, spacing and runner count follow from the worst-case equipment on the route.

  4. Block in six directions

    Cleats, blocks and cradles contacting the frame and fastened to the crate; bolt-through to the skid base for heavy items. The machine should not move when the crate is rocked by hand.

  5. Add moisture control

    VCI film or paper on machined surfaces, desiccant sized to voyage and cargo mass, a vapour barrier where appropriate, and a humidity indicator card so any claim can be diagnosed rather than argued.

  6. Sheath, treat, mark

    Plywood or solid board, corner cleats, top frame for stacking. The solid wood in the assembly, including frame, skids and internal bracing, heat treated and IPPC marked, typically on two opposite sides.

  7. Stencil what the far end needs

    Centre of gravity, sling points, this-way-up, do-not-stack, gross weight, dimensions. Riggers at the destination do not have your drawings.

What you can request

ProductConstructionUsed for
Cleated plywood cratePlywood on dimensional cleats, skid baseMachinery, tooling, electronics, export freight
Solid board export caseTight-butted solid lumber, braced cornersHeavy or long parts, ISPM-15 shipments
Open-top skid crateWalls on three sides, open topTall items loaded from above by crane
Slatted / ventilated crateSpaced boards for airflowProduce, nursery stock, castings
Cradles and saddlesContoured supportsPipe, coil, drums, tanks, rolls
Machine base / skidDoubled stringers, heavy deck, bolt pointsEquipment bases and sliding installs
On-site built crateBuilt around the part in placeOversized or already-installed machinery

The details that decide outcomes

Skid count and spacing
Two skids under a heavy centre load lets the base bow and the machine rack. Three runners distribute it better.
Corner reinforcement
Crates often fail at corners first under stacking. Vertical cleats and a top frame keep the box square.
Desiccant sizing
Scales with voyage length, enclosed volume and the moisture in cargo and packaging. Two bags in a 40′ container is decoration.
ISPM-15 on the whole assembly
Plywood sheathing is exempt; cleats, posts, skids and internal bracing are not. Most plywood crates still need treatment because the frame is solid lumber.
Forgotten dunnage
One untreated chock nailed in by a packer can make a shipment non-compliant. It is an easily missed item in export packing.
Paperwork
Packing lists, dimensions and weights for the freight forwarder, plus a treatment record for treated packing.

What a crating quote needs from you

Put these on the quote form. The more of them you can give, the fewer questions the partner supplier has to come back with.

Actual shipping weight
With fluids drained and loose parts separated. Not the catalogue weight.
Dimensions
Length, width, height of the item as it will be crated, including anything projecting.
Centre of gravity
Even approximately. It decides skid placement, sling points and whether the crate tips on a forklift.
Fragile faces and surfaces
Control panels, sight glasses, machined faces, anything that must not be braced against.
Designated lift and mounting points
Where the machine is designed to be picked up or bolted. Bracing connects here.
Receiving equipment
What forklift or crane exists at the destination. Tine length and free-lift matter a great deal.
Destination
Country and port. Decides treatment, marking and desiccant sizing.
Mode and voyage length
Road, ocean, air. A long ocean crossing is a different moisture problem from a short truck run.
Stacking requirement
Whether other freight will be stacked on it. This decides the top frame and corner posts.
Any customer packaging specification
Mention it in the Message field of the form; the partner supplier can say whether it can meet it.
Quantity and repeat frequency
One-off, or a recurring shipment.

Moisture control options for ocean freight

A sealed steel container goes through a daily temperature cycle for the length of the voyage. These are the common controls.

ControlWhat it doesWhen to use it
Kiln-dried wood packaging (≤19%)Removes a large moisture reservoir in many containersWorth asking about for ocean freight
Container desiccant, properly sizedAbsorbs water over a voyageSize it to volume, cargo and voyage length
VCI film or paperProtects machined and ferrous surfaces from corrosionAny bare metal
Vapour barrier bag around the productIsolates the product from container airHigh-value or highly corrosion-sensitive items
Ceiling and door clearanceLets condensate run to the floor instead of onto cargoA low-cost habit
Humidity indicator cardHelps show afterwards whether the problem was condensation or ingressMakes claims diagnosable rather than arguable
Loading dry and early in the dayAvoids sealing in saturated airWhere you control the loading
Breathable netting instead of stretch wrapStops the load becoming a humidity chamberOcean freight generally

On-site crating: how it works

For machinery that cannot safely be moved to a packing facility, or that is still bolted down. Availability depends on the partner supplier.

A survey comes first
Someone measures, finds the lift points, checks the route the crate will take out of the building, and confirms what equipment is on site. A crate built to the wrong door width is an expensive piece of firewood.
Materials are brought in
Lumber, panel, fasteners, bracing stock, VCI, desiccant and stencils. Confirm with the supplier what your site has to provide beyond access and a safe working area.
The base goes under the machine first
Usually the hardest part. Once the machine is on its skid base, the structure builds around it.
Bracing is fitted to the actual assembly
This is the real advantage. Blocks and cleats are cut to the machine rather than to a drawing, which is how you get restraint tight enough to survive long vibration.
Treatment is planned in advance
Treated, marked lumber can be brought to site so the finished crate does not need to go anywhere else. Raise it at the survey, and ask for the mark.
Paperwork leaves with the crate
Ask for the treatment record, dimensions, gross weight and a packing list for your forwarder.

Crating failure modes

Symptom on arrivalUsual causeDesign fix
Part has shifted inside an intact crateVoid in one of six directions; foam took a setRigid blocking fastened to the structure, all six directions
Base rails crushedSkids sized for the shipper's forklift, not the receiver'sCheck the destination equipment before sizing skids
Corners crushed, crate out of squareNo vertical corner posts or top frame under stackingCorner cleats plus a full top frame
Surface rust on machined facesContainer condensation, no VCI, undersized desiccantVCI plus desiccant sized to the voyage
Crate wet inside, cargo water-stainedGreen lumber plus sealed container; container rainKiln-dried packaging, ceiling clearance, humidity card
Base bowed, machine rackedTwo skids under a heavy centre massThree runners under concentrated loads
Container held at destination portUntreated dunnage, or a stamp on a replaced boardTreat and mark the whole assembly including chocks
Crate tipped during handlingUnmarked centre of gravityStencil CoG and sling points

Questions we get asked

Do plywood crates need ISPM-15 treatment?

The plywood is exempt because manufacturing it removes the pest risk, but the cleats, corner posts, skids and internal bracing are solid wood and in scope. In practice most cleated plywood crates still need treatment and marking because their structure is solid lumber. It is a common export compliance mistake.

Can a crate be built on our site?

Some partner suppliers can do this for oversized machinery, delicate assemblies or anything already bolted down. Mention it in the Message field of the form.

Can you work to a customer packaging specification?

We pass your request on; whether the specification can be met is for the partner supplier to say, and it should be settled before anyone commits. Mention it in the Message field of the form.

Is freight included?

Ask the partner supplier. For ocean freight, your forwarder will need the dimensions, weights and treatment paperwork.

How far in advance should we ask?

When the shipment is confirmed, not the week before it ships. Treatment has to be scheduled, odd lumber sections may need ordering, and an on-site build needs a survey. Late requests leave less room to prevent problems.

Can crates be stored for a recurring shipment?

Ask the partner supplier. For repeat shipments it can make sense to keep the design on file or use flat-packed kits, if the supplier offers that.

What paperwork should we ask for?

A treatment record for treated packing, dimensions, gross and net weights, and a packing list for your forwarder. If your destination or customer requires a specific document set, say so up front.

What is the largest crate that can be built?

That depends on the partner supplier. For very large machinery the constraints become the building, the route out and the lifting equipment rather than the lumber, and the job may suit a skid with a shroud or a rigging firm instead. Put the dimensions and weight on the form.

Keep reading

Last reviewed: 2026-10-31.

Next step

Ready for a quote?

Send the specification and a ZIP, and a partner supplier follows up with pricing and availability.

Request a quote