A good crate is designed around the part, not a catalogue size: weight, centre of gravity, fragile faces, lift points and the forklift waiting at the destination. Use the quote form and we pass your request to a partner supplier, who sets the design, price and terms. Heat-treated packing comes from suppliers enrolled in an approved program; ask for the mark.
Request a quote
Quantity, grade and ZIP are enough for a partner supplier to follow up with a quote.
Most damage is vibration, not impact
When a crated machine arrives damaged, the instinct is to assume somebody dropped it. Occasionally true. Very often the damage accumulated across long road miles and days at sea, as a part that was not fully restrained moved a few millimetres, repeatedly, a great many times.
Vibration finds every void. A machine blocked tightly in five directions and loose in the sixth will migrate in that one direction until it contacts something it should not. Fasteners back out, shafts fret, mounting feet shear, and none of it looks like impact damage, because it is not.
So the first principle is restraint in all six directions, fastened to the crate structure, with no reliance on friction and no voids filled by foam alone. Foam compresses, takes a set, and then stops working.
How a crate should be designed
Weight and centre of gravity
Actual shipping weight with fluids drained and loose parts separated, not the catalogue figure. The centre of gravity sets skid placement, sling points and whether the crate tips when picked up at the far end.
Find the load-bearing structure
Handling forces go around the product into frame members that can take them, never through sheet metal or a control panel. Designated lifting and mounting points are where bracing connects.
Size the skid base for the receiving forklift
The forklift at the destination may be smaller, with shorter tines and lower free-lift than yours. Skid height, spacing and runner count follow from the worst-case equipment on the route.
Block in six directions
Cleats, blocks and cradles contacting the frame and fastened to the crate; bolt-through to the skid base for heavy items. The machine should not move when the crate is rocked by hand.
Add moisture control
VCI film or paper on machined surfaces, desiccant sized to voyage and cargo mass, a vapour barrier where appropriate, and a humidity indicator card so any claim can be diagnosed rather than argued.
Sheath, treat, mark
Plywood or solid board, corner cleats, top frame for stacking. The solid wood in the assembly, including frame, skids and internal bracing, heat treated and IPPC marked, typically on two opposite sides.
Stencil what the far end needs
Centre of gravity, sling points, this-way-up, do-not-stack, gross weight, dimensions. Riggers at the destination do not have your drawings.
What you can request
| Product | Construction | Used for |
|---|---|---|
| Cleated plywood crate | Plywood on dimensional cleats, skid base | Machinery, tooling, electronics, export freight |
| Solid board export case | Tight-butted solid lumber, braced corners | Heavy or long parts, ISPM-15 shipments |
| Open-top skid crate | Walls on three sides, open top | Tall items loaded from above by crane |
| Slatted / ventilated crate | Spaced boards for airflow | Produce, nursery stock, castings |
| Cradles and saddles | Contoured supports | Pipe, coil, drums, tanks, rolls |
| Machine base / skid | Doubled stringers, heavy deck, bolt points | Equipment bases and sliding installs |
| On-site built crate | Built around the part in place | Oversized or already-installed machinery |
The details that decide outcomes
- Skid count and spacing
- Two skids under a heavy centre load lets the base bow and the machine rack. Three runners distribute it better.
- Corner reinforcement
- Crates often fail at corners first under stacking. Vertical cleats and a top frame keep the box square.
- Desiccant sizing
- Scales with voyage length, enclosed volume and the moisture in cargo and packaging. Two bags in a 40′ container is decoration.
- ISPM-15 on the whole assembly
- Plywood sheathing is exempt; cleats, posts, skids and internal bracing are not. Most plywood crates still need treatment because the frame is solid lumber.
- Forgotten dunnage
- One untreated chock nailed in by a packer can make a shipment non-compliant. It is an easily missed item in export packing.
- Paperwork
- Packing lists, dimensions and weights for the freight forwarder, plus a treatment record for treated packing.
What a crating quote needs from you
Put these on the quote form. The more of them you can give, the fewer questions the partner supplier has to come back with.
- Actual shipping weight
- With fluids drained and loose parts separated. Not the catalogue weight.
- Dimensions
- Length, width, height of the item as it will be crated, including anything projecting.
- Centre of gravity
- Even approximately. It decides skid placement, sling points and whether the crate tips on a forklift.
- Fragile faces and surfaces
- Control panels, sight glasses, machined faces, anything that must not be braced against.
- Designated lift and mounting points
- Where the machine is designed to be picked up or bolted. Bracing connects here.
- Receiving equipment
- What forklift or crane exists at the destination. Tine length and free-lift matter a great deal.
- Destination
- Country and port. Decides treatment, marking and desiccant sizing.
- Mode and voyage length
- Road, ocean, air. A long ocean crossing is a different moisture problem from a short truck run.
- Stacking requirement
- Whether other freight will be stacked on it. This decides the top frame and corner posts.
- Any customer packaging specification
- Mention it in the Message field of the form; the partner supplier can say whether it can meet it.
- Quantity and repeat frequency
- One-off, or a recurring shipment.
Moisture control options for ocean freight
A sealed steel container goes through a daily temperature cycle for the length of the voyage. These are the common controls.
| Control | What it does | When to use it |
|---|---|---|
| Kiln-dried wood packaging (≤19%) | Removes a large moisture reservoir in many containers | Worth asking about for ocean freight |
| Container desiccant, properly sized | Absorbs water over a voyage | Size it to volume, cargo and voyage length |
| VCI film or paper | Protects machined and ferrous surfaces from corrosion | Any bare metal |
| Vapour barrier bag around the product | Isolates the product from container air | High-value or highly corrosion-sensitive items |
| Ceiling and door clearance | Lets condensate run to the floor instead of onto cargo | A low-cost habit |
| Humidity indicator card | Helps show afterwards whether the problem was condensation or ingress | Makes claims diagnosable rather than arguable |
| Loading dry and early in the day | Avoids sealing in saturated air | Where you control the loading |
| Breathable netting instead of stretch wrap | Stops the load becoming a humidity chamber | Ocean freight generally |
On-site crating: how it works
For machinery that cannot safely be moved to a packing facility, or that is still bolted down. Availability depends on the partner supplier.
- A survey comes first
- Someone measures, finds the lift points, checks the route the crate will take out of the building, and confirms what equipment is on site. A crate built to the wrong door width is an expensive piece of firewood.
- Materials are brought in
- Lumber, panel, fasteners, bracing stock, VCI, desiccant and stencils. Confirm with the supplier what your site has to provide beyond access and a safe working area.
- The base goes under the machine first
- Usually the hardest part. Once the machine is on its skid base, the structure builds around it.
- Bracing is fitted to the actual assembly
- This is the real advantage. Blocks and cleats are cut to the machine rather than to a drawing, which is how you get restraint tight enough to survive long vibration.
- Treatment is planned in advance
- Treated, marked lumber can be brought to site so the finished crate does not need to go anywhere else. Raise it at the survey, and ask for the mark.
- Paperwork leaves with the crate
- Ask for the treatment record, dimensions, gross weight and a packing list for your forwarder.
Crating failure modes
| Symptom on arrival | Usual cause | Design fix |
|---|---|---|
| Part has shifted inside an intact crate | Void in one of six directions; foam took a set | Rigid blocking fastened to the structure, all six directions |
| Base rails crushed | Skids sized for the shipper's forklift, not the receiver's | Check the destination equipment before sizing skids |
| Corners crushed, crate out of square | No vertical corner posts or top frame under stacking | Corner cleats plus a full top frame |
| Surface rust on machined faces | Container condensation, no VCI, undersized desiccant | VCI plus desiccant sized to the voyage |
| Crate wet inside, cargo water-stained | Green lumber plus sealed container; container rain | Kiln-dried packaging, ceiling clearance, humidity card |
| Base bowed, machine racked | Two skids under a heavy centre mass | Three runners under concentrated loads |
| Container held at destination port | Untreated dunnage, or a stamp on a replaced board | Treat and mark the whole assembly including chocks |
| Crate tipped during handling | Unmarked centre of gravity | Stencil CoG and sling points |
Questions we get asked
Do plywood crates need ISPM-15 treatment?
The plywood is exempt because manufacturing it removes the pest risk, but the cleats, corner posts, skids and internal bracing are solid wood and in scope. In practice most cleated plywood crates still need treatment and marking because their structure is solid lumber. It is a common export compliance mistake.
Can a crate be built on our site?
Some partner suppliers can do this for oversized machinery, delicate assemblies or anything already bolted down. Mention it in the Message field of the form.
Can you work to a customer packaging specification?
We pass your request on; whether the specification can be met is for the partner supplier to say, and it should be settled before anyone commits. Mention it in the Message field of the form.
Is freight included?
Ask the partner supplier. For ocean freight, your forwarder will need the dimensions, weights and treatment paperwork.
How far in advance should we ask?
When the shipment is confirmed, not the week before it ships. Treatment has to be scheduled, odd lumber sections may need ordering, and an on-site build needs a survey. Late requests leave less room to prevent problems.
Can crates be stored for a recurring shipment?
Ask the partner supplier. For repeat shipments it can make sense to keep the design on file or use flat-packed kits, if the supplier offers that.
What paperwork should we ask for?
A treatment record for treated packing, dimensions, gross and net weights, and a packing list for your forwarder. If your destination or customer requires a specific document set, say so up front.
What is the largest crate that can be built?
That depends on the partner supplier. For very large machinery the constraints become the building, the route out and the lifting equipment rather than the lumber, and the job may suit a skid with a shroud or a rigging firm instead. Put the dimensions and weight on the form.