Grading is a promise; inspection is the proof
Anyone can write "Grade A" on an invoice. The reason buyers eventually leave a supplier is often not the price — it is opening a trailer and finding that Grade A meant something different that week. Consistency is the entire product.
A sound inspection checks the same seven things on every unit, in the same order. The order matters: each point is arranged so a reject gets caught by the cheapest possible test first, before anyone has spent labour on it.
The seven points
Protruding fasteners
A hand passes the full top deck and the lead boards. Any nail head standing proud, any shank poking through a replaced board, and the unit needs repair. This is first because it is the failure that damages product, tears stretch wrap and cuts hands — the one that generates complaints rather than inefficiency.
Deckboard presence and gaps
Board count against the grade spec, and gap width judged by eye against a reference unit. On a 48x40 GMA, top-deck gaps are typically no wider than about 3½"; wider and small-footprint product sags or falls through. Missing boards mean repair.
Stringer integrity
Each stringer gets a visual along its full length, with specific attention to the notch zones and the area under the lead boards. A crack through a notch is structural and the stringer needs repair or retirement. A surface check outside the load path passes.
Squareness
Diagonal comparison. A common working tolerance is about ½" for Grade A and ¾" for Grade B. Out-of-square units jam in drive-in racking, hang up on conveyor guides and stack unstably — and the fault is invisible until the pallet is loaded.
Bottom deck coverage
Count and placement of bottom boards, because this is what determines whether a pallet can be racked unsupported and whether it will ride a conveyor. A unit with the right top deck and a mauled bottom deck is a floor pallet, not a rack pallet, and should be sorted accordingly.
Stamp legibility
If a unit is sold as heat treated, the IPPC mark must be present, legible and on wood that is actually still part of the pallet. A valid-looking stamp on a board that was replaced is worse than no stamp, because it creates false confidence at a border.
Moisture and odour
Hand feel and smell. Soaked units should be set aside to dry rather than shipped heavy; anything with a chemical odour, visible mould bloom or dark spill staining should come out of the sales stream entirely.
Common failures and where they go
| Finding | Disposition | Reasoning |
|---|---|---|
| One missing deckboard | Repair | Quick fix with matched lumber; can return to Grade A or B depending on cosmetics |
| Cracked stringer through notch | Companion stringer or core | Bending capacity is compromised at the exact point loads concentrate |
| Out of square by 1" or more | Core / dismantle | Not economically correctable; the frame has racked |
| Mould bloom | Grind | Should not reach a buyer, regardless of grade or how new the unit looks |
| MB stamp | Remove from sale | Methyl bromide fumigation; reputable yards do not resell it at any grade |
| Unknown dark staining | Remove from sale | Nobody can say what it was, so it should not be sold |
| Heavy but sound | Dry stack | Sell after it sheds water; shipping water is shipping nothing |
What the inspection does not tell you
Inspection is not load testing. Nobody in this industry puts every unit under a press. What a seven-point check does is confirm that a unit matches the structural pattern its design implies — right boards, sound members, square frame. The load rating comes from the design, the species class and the fastener pattern, and it is a property of the specification rather than of the individual pallet.
This is why a good supplier asks how you will use a pallet before quoting. Racking unsupported across a span is a design question to settle before the inspection stage, by choosing solid-stringer units with full bottom coverage or a block pallet with a perimeter base. No amount of inspecting a notched partial-four-way unit will make it right for that application.
Questions we get asked
Can I inspect a load before it ships?
Ask the partner supplier; it depends on the supplier. Mention it in the Message field of the quote form, and the partner supplier can ask for photos. On any load you do see, check units from the middle of the stack rather than the top, and flip them over.
What happens if a load arrives off-grade?
Terms are set by the supplier, so agree the remedy in writing before you order. A clear remedy says who collects, who re-sorts and who redelivers, and it is worth more than a low price with nothing behind it.